成人在线免费观看,精品人伦一区二区三区,中文字幕亚洲欧美,日本三级在线,国产?日韩?欧美?中文?在线播放,伊人春色网站,亚洲天堂一区,日韩高清中文字幕

Your Place: Home >  News

The main cause of failure of sealing gasket in heat exchange unit

Date of Issuing:2020-10-28

Temperature is the main control process index in heat exchanger operation. Through the on-line instrument detection and inspection of the inlet and outlet temperature change of each fluid in the heat exchanger, the size of the medium flow, the quality of heat transfer and the presence of leakage can be analyzed and judged. It is necessary to prevent sharp changes in temperature, because temperature drastic change will cause that the expansion and contraction of the inner parts of heat exchanger, especially tube bundle and tube plate, are not consistent, resulting in temperature difference stress, which will lead to the separation or local deformation and crack of tube bundle and tube plate, and accelerate the corrosion and produce thermal fatigue crack.

If water is used as a cooling medium, it is better to control the outlet temperature below 38℃ and the temperature should not exceed 45 ℃. If the water temperature exceeds 38℃, the propagation of microorganism will accelerate obviously, and the decomposition of corrosion components will accelerate, which will cause the corrosion and perforation of the pipe. At the same time, the soluble calcium bicarbonate and magnesium bicarbonate will be decomposed by heat to form precipitation, which makes the scale formation of heat exchanger more and more serious and affects the heat transfer capacity of equipment. The heat transfer coefficient can be calculated by measuring and recording the temperature. The heat transfer efficiency is mainly reflected in the heat transfer coefficient, and the reduction of the heat transfer coefficient indicates the reduction of the heat exchanger efficiency. The inlet and outlet temperature and flow rate of two mediums of heat exchanger are measured regularly, the heat transfer coefficient of each period is calculated, and the trend chart of change is made with coordinate paper. It's going to be basically a continuous a gradual downward smooth curve, with smaller slope at the tangent point. When the heat transfer coefficient is too low to meet the process requirements, the mechanical or chemical cleaning should be used to improve the heat transfer coefficient to meet and maintain the process operation needs.

  • wechat

  • wechat

  • wechat

Address: No. 666 Xinshuini Road, Ganjingzi District, Dalian, Liaoning Province
Telephone: 0411-66880585/66880562
Fax: 0411-66880585
E-mail: hd_dl@163.com

Customer satisfaction is our goal

The company continues to create high quality products, to provide customers with energy saving, environmental protection, perfect cooling and heating solutions.
The products of Dalian Hongding are highly efficient and easy to use and maintain, achieving energy conservation and emission reduction, reducing costs and increasing economic benefits for enterprises.
“Good Faith, Quality First, Brand Establishment, Widely Renowned” is the object of the company.

Service Hotline:400-0977-195

格尔木市| 湖北省| 三穗县| 汕尾市| 高青县| 库尔勒市| 余姚市| 孝义市| 鱼台县| 浦江县| 包头市| 恩施市| 汪清县| 昭通市| 通许县| 天祝| 慈溪市| 保康县| 巍山| 无为县| 滁州市| 南川市| 潍坊市| 柯坪县| 册亨县| 托里县| 平罗县| 哈密市| 通化市| 股票| 诸城市| 清河县| 安溪县| 自治县| 盐亭县| 平山县| 瑞丽市| 金阳县| 平度市| 格尔木市| 昔阳县|